In the Negotiation e-doc, the KC system requires that the current status of the Negotiation e-doc is indicated via selection from a drop-down menu list. That list of options available from which to select is controlled by this maintenance document.
The Negotiation Status maintenance document is used to establish and maintain numeric codes and textual description values which are stored in database tables. This data serves as reference information that is made available for display and selection in various areas of the system, including e-docs and other maintenance e-docs.
Default: New negotiations are by default set to ‘In Process’ with this status code being set up as a parameter. The default lookup table includes the following configurable selections:
• In Process
• Complete
• Suspended
End Date Auto-Populate: A related parameter controls which status code selections result in automatic population of the Negotiation End Date.
For more
Figure 1262 Negotiation Status Maintenance Document - Layout
The Edit Negotiation Status section of the Negotiation Status maintenance document is a unique section that allows you to specify and maintain the details associated with the reference table record in fields.
Table 726 Negotiation Status Maintenance Document - Edit Negotiation Status Section Field Descriptions
Field |
Description |
Status Code |
The abbreviated and/or short version of the negotiation status. |
Description |
The full text version (long common name) of the negotiation status. |
Active |
Check to make active, uncheck to make inactive. |
Figure 1263 Negotiation Status Maintenance Document Example Values
This maintenance document includes the following features that are common to most KC maintenance documents:
Table 727 Links to Common Maintenance Document Component Instructions
Common Maintenance E-Doc Component |
Cross-Reference Links To Usage Instructions |
Document Header |
For more information, see “Header Area” in E-Doc Fundamentals. |
Document Overview Section |
For more information, see “Document Overview” on page 93 in Common E-Doc Tabbed Sections. |
Notes and Attachments Section |
For more information, see “Notes and Attachments” on page 94 in Common E-Doc Tabbed Sections. |
Ad Hoc Recipients Section |
For more information, see “Ad Hoc Recipients” on page 96 in Common E-Doc Tabbed Sections. |
Route Log Section |
For more information, see “Route Log” on page 97 in Common E-Doc Tabbed Sections. |
Action Buttons |
For more information, see “Action Buttons” on page 71 in Selection, Entry and Action Tools. |
For information about searching for, initiating, editing, copying, submitting, saving, closing, canceling, and/or routing a maintenance document, see “Common Maintenance E-Doc Operations” in the Overview section. |